Thursday, March 19, 2009

Bricking Paused for electrical work

There's been no brick work for the past week. In th meantime some of the electrical stuff has been put in. Simonds also called us to say that the remaining roof tiles have been delayed a couple of weeks.


first floor is wrapped up in insulation. scaffolding for brick work is set up and ready.

new bricks delivered.

ducted heating/cooling vents snake through the ceiling

over the family and dining area

surprisingly the shower flooring was delivered a week ago. ???whyyy??? it's still a long ways off

upstairs the vent works are much more concentrated

these things connect to a roof mounted evaporative cooling system

ceiling looks scary actually

the "orifice"

im standing on the neighbor's new floor (sorry). you can see their bricks are starting

in case you missed it that's the newly installed cooler at the top of the rear-side roof

some views when we climbed the scaffolding

looking "into" the upstairs windows

this would be our view from upstairs

end of the street alright

our new neighbor beginning construction

as a nice surprise, landscaping has begun on the linear park across our street

this would be a nice green park feature

shot of the rear again, now with the cooling system in place (and you can see the heating ducts through the unfinished roof)

No comments: